A complex project is won before construction starts.
Planning, coordination of professionals and rigorous execution of technical work, from the first sketch to commissioning.
One floor, layer by layer.
The plan lifts off the page and becomes an office floor. Scroll to separate each layer, with what we check before closing it in.
- 01Concrete slab
- 02Structure and core
- 03Partitions and glass rooms
- 04Mechanical and electrical
- 05Suspended ceiling
- 06Finishes and furniture
Project management comes first.
On technical work, quality can't be fixed at the end. It is planned, checked and documented at every stage. Here is how we work.
An execution plan before we start
Trade sequence, delivery lead times, critical path. Everyone works from the same document.
Mandatory hold points
Nothing is closed in without inspection and photos. A wall closed too early always costs more.
One thread between all professionals
Architect, acoustician, engineer, HVAC, electrician: we centralize the decisions and the drawings.
A discrepancy log
Every conflict between the drawings and site conditions is documented, then resolved with the right professional before work proceeds.
Hours, receipts and invoices in plain view
Whether time and materials or fixed price, the client sees where every dollar goes.
Typical sequence
ExampleThe client sees everything, in real time.
Site log, hold points, decisions and subcontractor invoices: every client has online access. No need to call to find out where the work stands. Try the tabs.