Bathroom renovation
Grout isn't waterproof. The membrane is.
Demolition down to the studs, new plumbing, a continuous waterproofing membrane, tile and ventilation. About 7 days of work once the materials have arrived.
A bathroom, step by step
8 steps · 8 hold pointsWhat protects your walls
ends up out of sight.
The membrane and the water test happen before the tile. That is where a bathroom lasts, or doesn't.
Hold point
What we do
- 01
Demolition
Down to the studs. We see the condition of the joists and walls before closing anything.
- 02
Plumbing
New supply and drain lines, shower, tub, vanity, toilet.
- 03
Waterproofing
Continuous membrane in the shower and the niche, slope to the drain checked.
- 04
Tile
Walls and floor, layout aligned with the niche, faucets and fixtures.
- 05
Ventilation and electrical
Fan vented outdoors, lighting, protected outlets. Electrical by a master electrician.
How it goes
- 01
Visit and selections
We measure, choose the materials with you and give you a detailed budget.
- 02
Demolition and plumbing
Demolition down to the studs, plumbing, electrical.
- 03
Waterproofing
Boards, membrane, then a water test of the shower.
- 04
Tile
Installation, grout and sealants.
- 05
Handover
Vanity, faucets, accessories, deficiency list with you.
The hold points.
Every point is checked and photographed. The photos go into your portal.
- 01Joists and walls inspected once the room is open, before the plumbing.
- 02Plumbing inspected and photographed before closing.
- 03Shower water-tested before tiling: no leak, or we redo it.
- 04Slope to the drain checked with a level.
- 05Fan ducted outdoors, never into the attic.
Permits and rules
Like-for-like replacement often needs no permit. Moving plumbing or touching the structure may require one, depending on the municipality. We check before we start.
Frequently asked questions
How long does the work take?
About 7 days of work once the materials have arrived.
Why a waterproofing membrane?
Tile grout lets water through. It is the membrane behind it that protects the walls and joists.
Can you replace the tub with a shower?
Yes. We check the slope and the floor drain before confirming it with you.
What if you find a problem once things are open?
We stop the work, show you what we found and price the fix at cost, with no margin, from the amount set aside with you for surprises. We resume once you say yes.