Kitchen renovation

The countertop is measured once the cabinets are in. Not before.

Custom cabinets, stone or quartz countertop, plumbing, electrical and lighting, coordinated by the same team. Work on site only starts once the cabinets are ready, so your kitchen is out of service for as short a time as possible.

A kitchen, step by step

8 steps · 8 hold points
The 3D view could not load on this device.

Eight steps,
eight checks.

This is the real order of the work. Every step has its hold point before the next one.

01 / 08 Framing

Hold point

What we do

  1. 01

    Design

    Layout, storage and materials, chosen with you or with your designer.

  2. 02

    Demolition

    The old kitchen removed, the house protected: tarps, a closed-off area, dust under control.

  3. 03

    Plumbing and electrical

    Sink, dishwasher, dedicated appliance circuits, under-cabinet lighting. Electrical work is done by a master electrician.

  4. 04

    Cabinetry and countertop

    Custom cabinets, quartz or stone countertop, backsplash.

  5. 05

    Finishes

    Flooring, paint, hardware, appliance installation.

How it goes

  1. 01

    Visit and plan

    We measure, look at how you use the kitchen, then give you a plan and a detailed budget.

  2. 02

    Fabrication

    Cabinets and countertop are custom-made. It is the longest lead time, and it happens before work on site.

  3. 03

    Demolition and mechanical

    Demolition, plumbing, electrical, range hood duct.

  4. 04

    Installation

    Cabinets, countertop template taken on site, countertop and backsplash installation.

  5. 05

    Handover

    Appliances, doors adjusted, deficiency list reviewed with you.

Before closing in

The hold points.

Every point is checked and photographed. The photos go into your portal.

Permits and rules

A kitchen that affects a load-bearing wall, plumbing or electrical may need a permit, depending on the municipality. For a load-bearing wall, an engineer sizes the beam before any demolition. We check with your city before we start.

Frequently asked questions

How long will we be without a kitchen?

Work starts when the cabinets are ready. We give you the schedule at the outset, and the time without a kitchen is kept to a minimum.

Can you move the sink or open up a wall?

Yes. We check the plumbing and structure; for a load-bearing wall, an engineer is involved before any demolition.

Do you work with a designer?

With yours, or we recommend one. We build to their drawings and settle every site discrepancy with them.

What if you find a problem once things are open?

We stop the work, show you what we found and price the fix at cost, with no margin, from the amount set aside with you for surprises. We resume once you say yes.

Let's talk about your project.

A visit, measurements, then a detailed budget. If the budget does not allow the work to be done properly, we will tell you at the first meeting.