A squeaky floor almost always comes down to preparation.

Hardwood, chevron and herringbone, engineered wood, large-format tile. The subfloor is checked and re-screwed before any installation, and the cuts line up from room to room.

A chevron floor, step by step

8 steps · 8 hold points
The 3D view could not load on this device.

What you don't see
makes the floor.

Half the work happens before the first board: subfloor, level, moisture, axis.

01 / 08 Before

Hold point

What we do

  1. 01

    Preparation

    Old flooring removed, subfloor checked, re-screwed and levelled.

  2. 02

    Hardwood and engineered wood

    Nailed, glued or floating installation depending on the product and the room.

  3. 03

    Patterns

    Chevron and herringbone, aligned with the axis of the rooms.

  4. 04

    Tile

    Large format, uncoupling membrane where needed, layout planned before the first tile.

  5. 05

    Finishes

    Thresholds, trim and baseboards fitted.

How it goes

  1. 01

    Visit

    We measure, check the subfloor and moisture, then give you a detailed budget.

  2. 02

    Acclimatization

    The wood rests in the house before installation, so it does not move afterwards.

  3. 03

    Preparation

    Removal, repair and levelling of the subfloor.

  4. 04

    Installation

    In the chosen pattern, cuts aligned from room to room.

  5. 05

    Handover

    Trim, thresholds, cleanup, final walkthrough.

Before closing in

The hold points.

Every point is checked and photographed. The photos go into your portal.

Good to know

Wood moves with humidity. That is why we let it acclimatize and keep an expansion gap under the baseboards.

Frequently asked questions

Chevron or herringbone: what is the difference?

In chevron, the board ends are cut at an angle and meet in a point. In herringbone, the rectangular boards meet at a right angle.

Can hardwood go in a basement?

We favour an engineered product or a floor covering suited to basement moisture.

When can we walk on it?

Most floors can be walked on as soon as installation is done; we give you the time for the product you choose.

What if you find a problem once things are open?

We stop the work, show you what we found and price the fix at cost, with no margin, from the amount set aside with you for surprises. We resume once you say yes.