Garage construction
A garage starts underground, below the frost line.
Detached or attached garage, workshop, annex: siting, permit, foundation, framing, roof, door and electrical. 2 to 3 weeks on site once the permit is issued.
An attached garage, step by step
10 steps · 10 hold pointsA garage starts
below the frost line.
Ten steps, ten checks. Here the roof goes on just before finishing so you can see inside; on site, it comes earlier.
Hold point
What we do
- 01
Drawings and permit
Siting on the lot, permit drawings, application filing.
- 02
Foundation
Footings and walls poured below the frost line, or an insulated slab depending on the soil and the project.
- 03
Framing and roof
Wood framing, roof trusses, sheathing, membrane, shingles or siding matched to the house.
- 04
Door and electrical
Insulated garage door with opener, service door, windows, lighting, outlets, EV charger if needed.
- 05
Finishing
Siding, soffits, gutters; interior left raw, insulated or finished depending on use.
How it goes
- 01
Visit
The lot, the use (car, workshop, storage), then a detailed budget.
- 02
Drawings and permit
Often the longest step: a few weeks depending on the city.
- 03
Foundation
Excavation, footings, walls or slab.
- 04
Construction
Framing, roof, openings, electrical: 2 to 3 weeks on site.
- 05
Handover
Finishes, cleanup, deficiency list with you.
The hold points.
Every point is checked and photographed. The photos go into your portal.
- 01Siting checked against the property lines before excavating.
- 02Formwork and rebar checked before the pour.
- 03Foundation inspected before backfilling.
- 04Attached garage: common wall with the house sealed, tight against exhaust gases.
Permits and rules
A garage or annex needs a permit, with siting rules: distance from the property lines, height, floor area. An attached garage must be separated from the house by a gas-tight wall. We check your city's requirements and prepare the application.
Frequently asked questions
Attached or detached garage?
An attached garage gives direct access to the house but requires a gas-tight separation; a detached one is easier to site. We advise you based on your lot and use.
How long does construction take?
2 to 3 weeks on site once the permit is issued. The permit timeline varies by municipality.
Can it be a heated workshop?
Yes. We adapt insulation, heating, electrical and ventilation to the intended use, within what the city allows.
What if you find a problem once things are open?
We stop the work, show you what we found and price the fix at cost, with no margin, from the amount set aside with you for surprises. We resume once you say yes.