Basement renovation
A damp basement isn't finished. It's fixed.
Moisture assessment, insulation, vapour barrier, partitions, electrical, and a bathroom or bedroom if needed. 2 to 3 weeks of work.
A basement, step by step
10 steps · 10 hold pointsMoisture gets fixed
before anything is closed.
A basement finished over a damp wall ends up growing mould. The assessment comes first.
Hold point
What we do
- 01
Moisture assessment
Walls, slab, drainage, windows: we find the cause before covering anything.
- 02
Insulation and vapour barrier
Foundation walls and rim joists insulated, continuous air and vapour barriers.
- 03
Partitions and ceiling
Room divisions, drywall or suspended ceiling, access panels for valves and ducts.
- 04
Electrical and lighting
Circuits, outlets, recessed and indirect LED lighting.
- 05
Plumbing and finishes
Bathroom or laundry room if needed, basement-appropriate flooring, doors, trim, paint.
How it goes
- 01
Visit and assessment
Moisture, ceiling height, windows, ducts. Then a detailed budget.
- 02
Preparation
Demolition, moisture correction, permit if the work requires one.
- 03
Framing and mechanical
Partitions, electrical, plumbing, ventilation.
- 04
Insulation and drywall
Insulation, sealed vapour barrier, drywall, taping.
- 05
Handover
Flooring, doors, paint, deficiency list with you.
The hold points.
Every point is checked and photographed. The photos go into your portal.
- 01No trace of moisture on the walls and slab before insulating.
- 02Electrical, plumbing and ventilation inspected and photographed before the insulation.
- 03Vapour barrier sealed at every joint and around every box, before the drywall.
- 04An access panel planned for every valve and every fitting.
Permits and rules
Depending on the work (adding a bedroom, plumbing, structure), a permit may be required. A basement bedroom must have a window you can get out through in an emergency. We check with your municipality.
Frequently asked questions
How long does the work take?
2 to 3 weeks for most basements, once the materials have arrived.
My basement is damp. Can it be finished?
Not before the cause has been found and fixed. We do this assessment at the first visit.
Can we add a bedroom?
Yes, with a compliant egress window and enough ceiling height. We check this with you.
Can the ceiling be soundproofed?
Yes. It is often the weak link between the basement and the ground floor: decoupling clips, insulation and double drywall.
What if you find a problem once things are open?
We stop the work, show you what we found and price the fix at cost, with no margin, from the amount set aside with you for surprises. We resume once you say yes.