Basement renovation

A damp basement isn't finished. It's fixed.

Moisture assessment, insulation, vapour barrier, partitions, electrical, and a bathroom or bedroom if needed. 2 to 3 weeks of work.

A basement, step by step

10 steps · 10 hold points
The 3D view could not load on this device.

Moisture gets fixed
before anything is closed.

A basement finished over a damp wall ends up growing mould. The assessment comes first.

01 / 10 Moisture assessment

Hold point

What we do

  1. 01

    Moisture assessment

    Walls, slab, drainage, windows: we find the cause before covering anything.

  2. 02

    Insulation and vapour barrier

    Foundation walls and rim joists insulated, continuous air and vapour barriers.

  3. 03

    Partitions and ceiling

    Room divisions, drywall or suspended ceiling, access panels for valves and ducts.

  4. 04

    Electrical and lighting

    Circuits, outlets, recessed and indirect LED lighting.

  5. 05

    Plumbing and finishes

    Bathroom or laundry room if needed, basement-appropriate flooring, doors, trim, paint.

How it goes

  1. 01

    Visit and assessment

    Moisture, ceiling height, windows, ducts. Then a detailed budget.

  2. 02

    Preparation

    Demolition, moisture correction, permit if the work requires one.

  3. 03

    Framing and mechanical

    Partitions, electrical, plumbing, ventilation.

  4. 04

    Insulation and drywall

    Insulation, sealed vapour barrier, drywall, taping.

  5. 05

    Handover

    Flooring, doors, paint, deficiency list with you.

Before closing in

The hold points.

Every point is checked and photographed. The photos go into your portal.

Permits and rules

Depending on the work (adding a bedroom, plumbing, structure), a permit may be required. A basement bedroom must have a window you can get out through in an emergency. We check with your municipality.

Frequently asked questions

How long does the work take?

2 to 3 weeks for most basements, once the materials have arrived.

My basement is damp. Can it be finished?

Not before the cause has been found and fixed. We do this assessment at the first visit.

Can we add a bedroom?

Yes, with a compliant egress window and enough ceiling height. We check this with you.

Can the ceiling be soundproofed?

Yes. It is often the weak link between the basement and the ground floor: decoupling clips, insulation and double drywall.

What if you find a problem once things are open?

We stop the work, show you what we found and price the fix at cost, with no margin, from the amount set aside with you for surprises. We resume once you say yes.